March 24, 2026 12:16 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Mamata unveils TMC candidate list for Bengal polls; to face Suvendu in Bhabanipur | ‘Not a one-day battle for me’: Mamata Banerjee on facing Suvendu Adhikari in Bhabanipur | Mamata vs Suvendu: Bhabanipur set for high-voltage showdown | Barbaric: India condemns Pakistani airstrike on Kabul hospital | Middle East conflict: Israel says it killed key Iranian commander during overnight strike | Middle East on edge: Kataeb Hezbollah commander Abu Ali al-Askari killed | Middle East on edge: Kataeb Hezbollah commander Abu Ali al-Askari killed | Afghanistan claims Pakistani airstrike on Kabul hospital left 400 killed, Islamabad denies | ECI orders major reshuffle in Bengal police brass a day after poll announcement | 10 patients killed in fire at SCB Medical College Hospital in Cuttack; staff injured
The new Pamban Rail Bridge will be India’s first vertical lift sea bridge. Photo courtesy: Facebook/SouthernRly

PM Modi to inaugurate new Pamban Rail Bridge, connecting Rameswaram to Indian mainland, today

| @indiablooms | Apr 06, 2025, at 11:42 am

Chennai/IBNS: Prime Minister Narendra Modi will inaugurate the newly constructed Pamban Rail Bridge on Sunday, which also marks the occasion of Ram Navami.

The new bridge will replace a 110-year-old structure that once connected Rameswaram to the Indian mainland.

This will be India’s first vertical lift sea bridge, and PM Modi will flag off the Rameswaram-Tambaram (Chennai) new train service and a ship from the road bridge.

PM Modi will also perform darshan and pooja at the Ramanathaswamy temple in Rameswaram.

The Pamban Rail Bridge carries a deep cultural significance as, according to the Ramayana, the construction of Ram Setu was initiated from Dhanushkodi in Rameswaram, a government statement said.

The bridge, linking Rameswaram to the mainland, stands as a remarkable feat of Indian engineering on the global stage and was built at a cost of over Rs 550 crore.

It is 2.08 km in length and features 99 spans and a 72.5-metre vertical lift span that rises to a height of 17 metres, facilitating smooth movement of ships while ensuring seamless train operations.

The bridge stands as a remarkable feat of Indian engineering on the global stage. Photo courtesy: X/Western Railway

Constructed with stainless steel reinforcement, high-grade protective paint, and fully welded joints, the bridge boasts increased durability and reduced maintenance needs.

It is designed for dual rail tracks to accommodate future demands. A special polysiloxane coating protects it from corrosion, ensuring longevity in the harsh marine environment.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.