April 16, 2026 11:16 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR: Supreme Court allows voters restored by tribunal till April 21 and 27 to vote | 'Women won't spare you': PM Modi warns Opposition over resistance to quota bill | Vijay booked in 3 cases over poll code violation ahead of Tamil Nadu polls | 'Black law': Stalin burns copy of 'delimitation' bill, slams Modi govt | TCS halts Nashik BPO operations amid sexual abuse, conversion allegations | ‘We are surprised’: SC stays Pawan Khera’s bail over remarks on Himanta Biswa Sarma’s wife | Historic shift: Bihar gets first BJP CM as Samrat Choudhary takes oath | 'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping
Ministry of Railways
Image: Unsplash

Ministry of Railways decides disbandment of five Railway Engineers Territorial Army Regiments

| @indiablooms | Jun 06, 2022, at 09:31 pm

New Delhi: A Committee of three Executive Directors/Principal Executive Director was constituted in the Ministry of Railways to review the existing Functional Establishment of six Railway Engineers Territorial Army Regiments located at Jamalpur, Jhansi, Kota, Adra, Chandigarh and Secunderabad.

The Committee re-assessed the operational requirements of Railway TA Regiments.

On the basis of the recommendations of the above Committee and with the concurrence of the Ministry of Defence and Directorate General of Territorial Army, Ministry of

Railways have decided as under:

Disbandment of five Railway Engineers Territorial Army Regiments located at Jhansi, Kota, Adra, Chandigarh and Secunderabad.

Retention of one Railway Engineer Regiment (TA) located at Jamalpur for the operational role along the route New Jalpaiguri-Siliguri-Newmal-Alipurduar-Rangiya (361Kms) to cover the critical rail link through Siliguri corridor and further upto Rangiya as proposed by Ministry of Defence.

The disbandment process is to be completed by Directorate General Territorial Army within a duration of nine months from the date of issue of Ministry of Railways letter dated 03.06.2022 and the modalities for the same are to be worked out by DGTA in consultation with Ministry of Railways and Ministry of Defence.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.