January 21, 2026 01:41 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Nitin Nabin becomes BJP’s youngest president ahead of key assembly polls, PM Modi calls him ‘my boss’ | Viral video scandal rocks Karnataka Police: DGP Ramachandra Rao suspended | Jolt to ECI over SIR! SC allows BLAs at hearing, questions 'logical discrepancy'; TMC declares 'BJP's game over' | Will dal disrupt diplomacy? US lawmakers urge Trump to act on India’s 30% pulse tariff | 'Pakistan deserves Operation Sindoor 2.0', says Baloch leader over Trump’s Gaza board invitation to Islamabad | From Malda to the nation: PM Modi unveils India’s Vande Bharat sleeper | War zone Beldanga: Highway blocked, reporters attacked in migrant death protests | Can a Nobel Peace Prize be given away? Committee breaks silence after Machado hands over medal to Trump | Europe scrambles troops to Greenland as Trump’s takeover push triggers Arctic power showdown | Nobel drama: Venezuelan leader presents Peace Prize to Trump
Nitin Gadkari
Image: Nitin Gadkari Twitter page

India creates new Guinness World Record by laying 75 km of bituminous concrete in a single lane on NH53 in record time in Maharashtra

| @indiablooms | Jun 08, 2022, at 10:13 pm

New Delhi: Union Minister for Road Transport and Highways Nitin Gadkari announced on Tuesday the New Guinness World Record created by NHAI in laying 75 km of bituminous concrete in a single lane on NH53 in 105 hours and 33 minutes .

In a video message Gadkari said commemorating 75 years of India’s independence and under the aegis of Azadi Ka Amrit Mahotsav announced by the Prime Minister Narendra Modi NHAI has created a world record that was certified by the Guinness World Records.

He said the record has been made for laying 75 km of bituminous concrete in a single lane on NH 53 between Amrawati to Akola Districts in 105 hours and 33 minutes. 

The total length of the 75 km of single lane continuous bituminous concrete road is equivalent to 37.5 km of two-lane paved shoulder road and the work started on 3rd June 2022 at 7:27 am and completed on 7th June 2022 at 5 pm, he added.

The Minister said the bituminous mix of 36,634 MT consisting of 2,070 MT of bitumen was used.

He said the project was implemented by 720 workers including a team of independent consultants worked day and night to complete this task. 

Gadkari said before this, the Guinness World Record for the longest continuously laid bituminous was for building 25.275 km that was achieved in Doha, Qatar in Feb 2019. The task took 10 days to complete.

The Minister said the Amrawati to Akola section is part of NH 53,this is an important east-east corridor which connects major cities like Kolkata, Raipur, Nagpur and Surat.

He said once completed, this stretch will play a major role in easing movement of traffic and freight on this route. 

Gadkari congratulated all the engineers, contractors, consultants, workers from NHAI and Raj Path Infracon Pvt. Ltd. for efficient implementation of the project that has helped in successful completion of this world record.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.