June 27, 2026 08:05 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Fresh paper leak rocks India: Maharashtra TET postponed a day before exam, over 4 lakh aspirants affected | Pune fort murder case: Siya Goyal's brother says family would have called off marriage if she had objected | Donald Trump gets a road named after him in India, says 'Thank You!' | Fresh setback for Gautam Adani? US judge asks DoJ to justify dropping criminal charges | Ram Mandir Trust chief Champat Rai resigns as alleged donation siphoning row escalates | Ram Mandir fund row deepens: 8 arrested days after BJP called allegations 'false narrative' | 'Who tied the hands of CBI?': Calcutta HC on RG Kar case; victim's mother, now BJP MLA, says she is 'deeply disturbed' | Construction comes to a standstill at nearly 700 Kolkata projects after Taratala warehouse tragedy kills 15 | World Cup shocker! Ecuador stun Germany 2-1, storm into Round of 32 | Iran-US conflict: Cargo vessel hit near Strait of Hormuz, UN agency pauses evacuation operations
Kut Kul Pass
Image: Wikimedia Commons

Div Com Kashmir visits the work site at Nawab Bazar.

| @indiablooms | Feb 12, 2022, at 02:06 am

Srinagar/IBNS: The Divisional Commissioner (Div Com) Kashmir, Pandurang K Pole Thursday visited Nawab Bazar to inspect the work of removal of unhygienic material including garbage trash, building material from both embankments of Kut Kul being executed by Irrigation and Flood Control Department.

On the occasion, Div Com said that Kut Kul passing through Shehar-e-Khas will be cleaned and made navigable by March.

Meanwhile, Div Com directed the Executive Engineer to complete the work within a week.

He also directed contractors to start cleaning work at other places, simultaneously and officers to repair the remaining walls of the kul wherever needed.

Div Com enjoined on the Executive Engineer to communicate with locals and  make them aware about their responsibilities to keep Kul clean from garbage and other trash material.

Div Com was informed that the material is amassed during the day and taken  away to the dumping site by the late hours.

The 2.8 kilometres long Kul is being cleaned at the cost of 18.41 lakhs by the Irrigation and Flood Control Department.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.