October 01, 2026 04:55 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Israel-bound flight lands in Saudi Arabia as pilots fight in cockpit, stabbing triggers hijack scare mid-air | Vimal ad row: SRK, Ajay Devgn, Tiger Shroff respond to FDA notices, says Tukaram Mundhe | Vijay’s TVK expands to Bengal? Party breaks silence on Purba Bardhaman office | ‘This guy is a monster’: Trump’s hilarious praise for Sundar Pichai, Google CEO’s witty reply | Gyanesh Kumar row exposes INDIA bloc rift: DMK, AAP skip meet, Akhilesh sends representative | SIR row: Supreme Court to hear plea against CEC Gyanesh Kumar next week | Sambhal violence case: SC quashes key accused Mulla Afroz's NSA detention, slaps Rs 10 lakh cost on UP govt | Nandigram bypoll twist: Calcutta HC grants interim bail to Congress candidate Milan Pradhan till Oct 21 | Myanmar military airstrike horror: 49 killed, 58 injured as bombs hit crowded Rakhine market | Britain reopens refugee routes for Afghans, Palestinians as immigration and integration battle intensifies
Photo Courtesy: twitter.com/UttarkashiPol

Live Blog: Uttarakhand tunnel collapse rescue ops hit final stage; Elaborate preps to evacuate 41 trapped workers

| @indiablooms | Nov 24, 2023, at 12:22 am

The final phase of the rescue mission at the Silkyara tunnel collapse site, where 41 workers have been trapped since November 12, is currently underway. The National Disaster Management Authority (NDMA) anticipates that the rescue operation will be successfully concluded within the next few hours or by Friday, media reports said.

With only 10 meters remaining in the operation, the rescue team is gearing up to insert and weld pipes to create a safe passage for the workers' escape. 

 

LIVE Updates

Preperations complete for vertical drilling: International Tunneling Expert Arnold Dix

International Tunneling Expert Arnold Dix said that the vertical drilling, access roads, and sites required for the ongoing rescue operation in Uttarkashi have been readied.

"The vertical drilling is all prepared, as in all the sites prepared, the access roads prepared, everything's prepared, and decisions being taken shortly about what to do with the vertical drilling. But all of the different access routes affect each other," Dix was quoted as saying by news agency ANI.

Trapped workers likely to be be rolled out in wheeled stretchers

News agency PTI reported, citing Atul Karwal, the Director General of the National Disaster Response Force (NDRF), that the trapped workers will be evacuated one-by-one on wheeled stretchers through a large pipe that is being drilled to reach them.

Uttarakhand Police sets up green corridor to deal with emergencies during rescue ops

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.