October 07, 2026 11:38 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Crash axe’ blow fractured Smit Machchhar’s skull: Shocking details emerge from flydubai cockpit horror | ‘Vote thief’ Gyanesh Kumar: Rahul Gandhi climbs barricade, waves Tricolour during explosive INDIA bloc protest | ‘Crash axe’ blow fractured Smit Machchhar’s skull: Shocking details emerge from flydubai cockpit horror | ‘He should not have been flying’: JD Vance on Flydubai co-pilot | Israel was ready to shoot down Flydubai jet if it kept flying towards Tel Aviv: Reports | 'If law wasn't followed, we can undo it': Supreme Court's big warning on SIR process amid Gyanesh Kumar row | From TMC Rajya Sabha MP to BJP nominee in 6 months: Koel Mallick's stunning political U-turn | ‘Stomp on your head’: Omani flydubai co-pilot’s chilling posts on violence against women surface | Asian Games 2026: India beat Pakistan to clinch gold in men's cricket | flydubai cockpit attack: Deleted posts expose Omani co-pilot’s views on women, alleged extremist past

India's GSAT-18 Communication Satellite launched successfully

| | Oct 06, 2016, at 02:32 pm
New Delhi, Oct 6 (IBNS): India’s communication satellite GSAT-18 was launched successfully by the European Ariane 5 VA-231 launch Vehicle in the early morning hours of today (October 06, 2016). The 3404 kg GSAT-18 carries 48 communication transponders in C-band, upper extended C-band and Ku-band for providing various services to the country.

After a smooth countdown, the Ariane 5 launch vehicle lifted off right on schedule at 0200 hrs (2:00 am) IST today. After a flight of 32 minutes and 28 seconds, GSAT-18 separated from the Ariane 5 upper stage in an elliptical Geosynchronous Transfer Orbit (GTO) with a perigee (nearest point to Earth) of 251.7 km and an apogee (farthest point to Earth) of 35,888 km, inclined at an angle of 6 degree to the equator.

ISRO's Master Control Facility (MCF) at Hassan in Karnataka took over the command and control of GSAT-18 immediately after its separation from the launch vehicle. Preliminary health checks of the satellite revealed its normal health.

In the coming days, orbit raising manoeuvres will be performed to place GSAT-18 satellite in the Geostationary Orbit (36,000 km above the equator) by using the satellite’s propulsion system in steps.

After the completion of orbit raising operations, the two solar arrays and both the antenna reflectors of GSAT-18 will be deployed. 

Following this, the satellite will be put in its final orbital configuration.  GSAT-18 will be positioned at 74 deg East longitude in the geostationary orbit and will be co-located with the Indian operational geostationary satellites. Later, it is planned to experimentally turn on the communication payloads of GSAT-18.

After the successful completion of all the in-orbit tests, GSAT-18 will be ready for operational use.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.