October 19, 2026 06:01 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Internet access a fundamental right for children': SC rejects age-based 'blanket' ban | 'We will fight our own government': RG Kar victim's father threatens fresh protest after Sandip Ghosh gets bail | RG Kar shocker: Sandip Ghosh gets bail as only 7 of 147 witnesses examined, junior doctor blasts CBI | Trump waives Russia-related sanctions | 'How dare Elon Musk?' Owaisi defends Modi after billionaire's 'real boss' jibe at Ambani | 'B****y S***': IAS officer's abuse of female colleague during virtual J&K meeting sparks row | Aamir Khan’s nephew Imran Khan asked to leave India by Oct 28 after joining anti-CEC protest | ‘Their crime? Demanding justice’: Rahul Gandhi slams 4 AM detention of Ankita Bhandari’s parents | ‘Bangladesh showed us the way’: Neha Bora’s remarks spark BJP attack on Rahul Gandhi | Chingrighata flyover skid scare: Bikes fall, anti-skid blocks installed overnight as Bengal Minister Agnimitra Paul faces criticism

SunEdison announces completion of 1-Megawatt Canal Top Solar Project for Karnataka Govt

| | Jun 24, 2015, at 04:38 am
Bangalore, June 23 (IBNS): SunEdison, a renewable energy development company, on Tuesday announced the completion of a 1-megawatt DC canal top solar power plant built for Krishna Bhagya Jala Nigam Ltd (KBJNL), the Karnataka government agency responsible for the Krishna River and Dam.

Pashupathy Gopalan, President of SunEdison Asia-Pacific said: “SunEdison is extremely proud to successfully install and commission this canal top system on the banks of the Krishna River for the Karnataka government. It is wonderful to see other state governments embrace this innovative use of solar technology, which was pioneered by SunEdison for the Narmada Canal Top Project in Gujarat in 2012.”

As the name implies, canal top solar systems are built over water canals. This type of system provides several unique benefits. While solar generated electricity saves large amounts of water compared to fossil fuel generated electricity, canal top systems save even more water by shielding the canals from the direct sun and hence reducing evaporation. Additionally, canal top systems free up the surrounding land for other uses. Finally, canal top systems operate at cooler temperatures than conventional land based systems and generate more energy as a result.

Gopalan added: “We thank the Karnataka Government, the Honourable Chief Minister Shri Siddaramaiah, the Honourable Energy Minister Shri D. K. Shivakumar and the KBJNL authorities for their support in this project. We also thank the local community for their support during the project execution.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.