December 25, 2025 05:30 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tarique Rahman returns to Bangladesh after 17 years | Shocking killing inside AMU campus: teacher shot dead during evening walk | Horror on Karnataka highway: sleeper bus bursts into flames after truck crash, 9 killed | PM Modi attends Christmas service at Delhi church, sends message of love and compassion | Delhi erupts over lynching of Hindu man in Bangladesh; protest outside High Commission | Targeted killing sparks global outrage: American lawmakers condemn mob lynching of Hindu man in Bangladesh | Assam on a ‘powder keg’: Himanta Biswa Sarma flags demographic shift, Chicken’s Neck fears | Bangladesh on edge: Student leader shot as pre-poll violence deepens after Hadi killing | Historic deal sealed: India, New Zealand sign landmark Free Trade Agreement in record time | Supreme court snubs urgent plea to stop PMO’s chadar offering at Ajmer Sharif

No shortage of Power for West Bengal: NTPC

| | Apr 04, 2016, at 07:30 pm
New Delhi. Apr 4 (IBNS) There is a dip in the water level at Farakka Feeder Canal due to diversion of water to Bangladesh as per the international treaty and as a result, NTPC said it has been forced to temporarily stop five units (1600 MW) out of its six units (2100 MW) at Farakka.

Currently, one unit of 500 MW is under operation. 

The situation is likely to continue till Apr 10

"However there will not be any shortage of power to the West Bengal as a result of these closures," NTPC said in a statement.

"The total allocation to West Bengal from NTPC stations is 786 MW, which can be fully met by NTPC from its stations, if power is requisitioned by the State. In fact, even now Farakka and Kahalgaon Stations are not fully scheduled, leading to partial loading. If required by the State, NTPC can also supply more than its allocation to West Bengal by supplying surplus power from NTPC stations. The State has also surrendered its 199 MW power allocation from NTPC Barh Stage-II (2X660 MW) in the State of Bihar," it said.

In short, enough power is available with NTPC to meet any requirement of the state, NTPC said.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm