April 03, 2026 12:14 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
AAP drops Raghav Chadha from key parliamentary role, sparks buzz over internal rift | Amit Shah to camp in West Bengal for 15 days during Assembly polls; predicts Mamata’s defeat in state and Bhabanipur | 'BJP plotting President’s Rule, don’t fall in the trap': Mamata Banerjee on Malda unrest, urges peace | 'Most polarised state': CJI Kant raps Bengal govt over 9-hour hostage of judicial officers | Bengal SIR protest: Judge pleads for help amid mob attack after 9-hour hostage ordeal | Bengal SIR progress: 47 lakh of 60 lakh adjudicated cases disposed of, Supreme Court informed | Amit Shah to join Suvendu Adhikari on Bhabanipur nomination day; BJP plans mega roadshow | Fuel prices rise: Premium petrol, diesel hiked amid oil price surge | Commercial LPG up Rs 195.50 as global oil prices rise; domestic rates unchanged | Layoff alert: Oracle cuts 30,000 jobs globally, 12,000 hit in India

No shortage of Power for West Bengal: NTPC

| | Apr 04, 2016, at 07:30 pm
New Delhi. Apr 4 (IBNS) There is a dip in the water level at Farakka Feeder Canal due to diversion of water to Bangladesh as per the international treaty and as a result, NTPC said it has been forced to temporarily stop five units (1600 MW) out of its six units (2100 MW) at Farakka.

Currently, one unit of 500 MW is under operation. 

The situation is likely to continue till Apr 10

"However there will not be any shortage of power to the West Bengal as a result of these closures," NTPC said in a statement.

"The total allocation to West Bengal from NTPC stations is 786 MW, which can be fully met by NTPC from its stations, if power is requisitioned by the State. In fact, even now Farakka and Kahalgaon Stations are not fully scheduled, leading to partial loading. If required by the State, NTPC can also supply more than its allocation to West Bengal by supplying surplus power from NTPC stations. The State has also surrendered its 199 MW power allocation from NTPC Barh Stage-II (2X660 MW) in the State of Bihar," it said.

In short, enough power is available with NTPC to meet any requirement of the state, NTPC said.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm