July 01, 2026 08:57 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Ram Mandir donation theft: Six accused were employed by Varanasi-based security firm, probe reveals | Ayodhya Ram Temple donation theft: Probe says majority of money was allegedly stolen during Kumbh Mela | Commercial LPG price slashed by Rs 183.50 from July 1; check new rates in Delhi, Mumbai, Kolkata and Chennai | Trump suffers major blow as US Supreme Court upholds birthright citizenship | Delhi-Mumbai Expressway horror: Passenger bus goes up in flames after fatal collision, 8 dead | 'Dharmendra Pradhan will be responsible if anything happens': CJP warns as Sonam Wangchuk's health worsens on day 3 of hunger strike | Adani Ports seals $1.4 billion mega deal as MSC buys 49% stake in Vizhinjam port | Ram Temple donation scam: Former trust chief Champat Rai grilled by SIT for 2 hours, says report | Brazil escape Japan scare, Germany crash out as Paraguay script World Cup shocker | India overtakes Taiwan, South Korea to become world's fifth-largest equity market again

L&T Construction commissions Solar PV Plant in Punjab

| | Sep 04, 2014, at 04:35 am
Mumbai, Sept 3 (IBNS): Solar EPC company L&T Construction has recently commissioned the world's largest Solar Photovoltaic Plant of 7.52 MWp capacity on a single roof at Amritsar in Punjab.
The energy generated from this plant is being fed to the local grid through a power purchase agreement (PPA) signed with the state distribution company under the New and Renewable Sources of Energy (NRSE) Policy.
 
For this project, L&T employed multi-crystalline module technology and central inverters to optimize efficiency. 
 
More than 30,000 panels were erected on the rooftop of the shed spread over 94,000 sq.m area.
 
Since for this project, the rooftop modules had to be erected on fragile asbestos roof sheets, L&T’s project engineers designed and implemented an appropriate and customized Balance of System. 
 
Without stressing the existing roof sheets, the entire load of the PV modules and BoS were transferred to the roof of the space frame members of the top and middle chords. Lightweight aluminium structures were used for mounting the modules and water proofing techniques were used to avoid leakages.
 
L&T along with the customer came up with an idea of erecting a permanent network of aluminium walkways on top of the roof sheets to create a safe working environment for execution, operation and maintenance purposes.
 
Commenting on the achievement, S. N. Subrahmanyan, Senior Executive Vice President (Infrastructure and Construction), L&T said, “This is for us, at L&T Construction, a significant step towards establishing our credentials as the country’s largest and leading Solar EPC Company. It is also extremely creditable that this state-of-the-art solar power plant has already exceeded the estimated performance.”
 
L&T is India’s largest Solar EPC Company with over 400 MW (including commissioned and under-construction) solar PV and concentrated solar thermal power projects.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm