July 27, 2026 02:17 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Victory of democracy': Sonam Wangchuk congratulates Gen Z as Dharmendra Pradhan resigns after month-long NEET protests | 'Democracy has triumphed': CJP celebrates as Dharmendra Pradhan quits, warns Centre 'Don't mess with cockroaches' | Centre buckles under CJP-led NEET protests; Dharmendra Pradhan quits as Education Minister | Delhi Police flags 2,500 suspected criminals at Jantar Mantar amid NEET protest | 'No assurances, sack Dharmendra Pradhan': CJP fires back at PM Modi over NEET row | 'Don't insult students': Rahul Gandhi tears into PM Modi's midnight NEET video, demands Dharmendra Pradhan's exit | Trump slaps fresh tariffs on India, China and 58 others over forced labour concerns | Sonam Wangchuk ends 26-day hunger strike after 'long negotiations', urges CJP protesters to maintain peace | PM Modi promises fresh steps on paper leaks in late night video | NEET protest: Centre invites CJP for talks; protesters stick to Jantar Mantar or neutral venue demand

Road over-bridge near Asansol to ease traffic congestion

| | May 23, 2016, at 09:08 pm
Kolkata, May 23 (IBNS) An over-bridge (flyover) over the railway level crossing -- near Kumarpur in Asansol, West Bengal -- on GT Road will be constructed by the Eastern Railways and SAIL-ISP on shared cost basis.
The level crossing is across a stretch of the road that connects Asansol to industrial areas such as Barakar, Sitarampur, Rupnarayanpur, Kulti and Chittaranjan.
 
Manas Sarkar, Chief Engineer (CON-II), Eastern Railways and  Vivek Gupta. GM (Projects), SAIL-ISP signed the Memorandum  of Understanding (MoU) on Saturday on behalf of their respective organisations, in the presence of Babul Supriyo, Union Minister of State for Urban Development, Housing and Urban Poverty Alleviation, who laid the foundation stone of the over-bridge.
 
While the construction of the over-bridge ease the traffic congestion that occurred with the frequent closing of the level crossing gate, it will also allow SAIL-ISP to increase its steel dispatches from its newly-expanded 2.5mtpa capacity steel plant.
 
 
Images: Inauguration of road overbridge foundation stone and MoU signing

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.