October 05, 2026 11:18 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'If law wasn't followed, we can undo it': Supreme Court's big warning on SIR process amid Gyanesh Kumar row | From TMC Rajya Sabha MP to BJP nominee in 6 months: Koel Mallick's stunning political U-turn | ‘Stomp on your head’: Omani flydubai co-pilot’s chilling posts on violence against women surface | Asian Games 2026: India beat Pakistan to clinch gold in men's cricket | flydubai cockpit attack: Deleted posts expose Omani co-pilot’s views on women, alleged extremist past | flydubai cockpit horror: Omani co-pilot Hamam al-Hammami attacked Captain Smit Machchhar with crash axe, tried to seize control | flydubai temporarily suspends all Israel flights after co-pilot’s alleged cockpit attack, crash attempt | Grounded in Oman over ‘radical views’, then hired by flydubai: What we know about Omani pilot Hamam al-Hammami | ‘Hanuman Chalisa gave me courage’: Smit Machchhar recounts flydubai cockpit battle to PM Modi | PM Modi speaks to Flydubai pilot Smit Machchhar who foiled crash plot, praises his courage

Road over-bridge near Asansol to ease traffic congestion

| | May 23, 2016, at 09:08 pm
Kolkata, May 23 (IBNS) An over-bridge (flyover) over the railway level crossing -- near Kumarpur in Asansol, West Bengal -- on GT Road will be constructed by the Eastern Railways and SAIL-ISP on shared cost basis.
The level crossing is across a stretch of the road that connects Asansol to industrial areas such as Barakar, Sitarampur, Rupnarayanpur, Kulti and Chittaranjan.
 
Manas Sarkar, Chief Engineer (CON-II), Eastern Railways and  Vivek Gupta. GM (Projects), SAIL-ISP signed the Memorandum  of Understanding (MoU) on Saturday on behalf of their respective organisations, in the presence of Babul Supriyo, Union Minister of State for Urban Development, Housing and Urban Poverty Alleviation, who laid the foundation stone of the over-bridge.
 
While the construction of the over-bridge ease the traffic congestion that occurred with the frequent closing of the level crossing gate, it will also allow SAIL-ISP to increase its steel dispatches from its newly-expanded 2.5mtpa capacity steel plant.
 
 
Images: Inauguration of road overbridge foundation stone and MoU signing

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.