November 24, 2026 12:34 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Water safe for consumption': Bisleri breaks silence on FSSAI prosecution reports | Balen Shah meets PM Modi: India and Nepal look to strengthen ties, launch new train service | Youth Congress workers storm Meta's Hyderabad office, smashes flower pots; gives 7-day ultimatum over account suspension | 'Resign out of shame!': Rajasthan Congress chief demands Bhajan Lal Sharma's exit after BJP's Rajasthan poll rout | Congress sweeps Rajasthan Panchayat polls! BJP suffers major setback as Gehlot, Pilot target ruling party | 'Dropped because his name is Siraj?': Congress alleges discrimination, BJP hits back over pacer's exclusion | Rahul Gandhi's 'compromised PM' jibe at Modi over Trump-Putin-Xi meet leaves BJP fuming | ‘Cyclone Akvan weakens after landfall in Odisha, heavy rain triggers waterlogging in several areas’ | 'No talks until terror stops': Rahul Gandhi's blunt message to Pakistani student in US | 'Khao, peeyo, mauj karo' not Indian culture: PM Modi's big message on savings
Tunnel collapse
Photo courtesy: Uttarkashi Police X page

Rat-hole miners begin manual drilling at Uttarakhand tunnel to rescue 41 trapped workers

| @indiablooms | Nov 28, 2023, at 06:20 am

Manual horizontal drilling has started at the Uttarakhand tunnel where 41 men have been trapped for more than two weeks, reports said.

The process started this evening after the American Augur Drill broke again, its blades fouled up by an iron grill from the tunnel ceiling and other debris.

The work is being conducted by "rat miners"—labourers used to drill narrow shafts as part of a primitive method of coal extraction.

The vertical drilling to create an extra passageway has already progressed to 36 meters, officials said.

Manual drilling from top and side are the two methods on which rescue workers are focussing after several other methods failed. Horizontal drilling from the Barkot end of the tunnel is also in progress.

Neeraj Khairwal, Secretary, Uttarakhand government, said 24 rat miners will work 24 hours to remove manual debris. The work will be done in three shifts.

The Auger Machine, once in working condition, will push the 800-mm pipe forward as the manual drilling progresses.

The officials, however, refused to give a time frame for the rescue.

Manual drilling is a slow and labor-intensive process in which the rat-hole miners will go through the 800 mm pipe, drill manually, and bring out the debris with shovels.

With 10 to 12 meters left to reach the trapped workers and machine drilling options exhausted, manual drilling appears to be the only way forward, the authorities indicated.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.