September 12, 2026 05:18 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Suvendu Adhikari eats fish bhog at Kalighat Temple amid Bageshwar Baba row | Bangladeshi Hindu monk Chinmoy Krishna Das breaks down emotionally as he gets 5-hour parole to attend mother’s funeral | Sheikh Hasina’s daughter Saima Wazed quits WHO post amid fraud allegations | After days of silence, China confirms Xi Jinping’s India visit for BRICS Summit | Big setback for Abhishek Banerjee as CID arrests aide Sumit Roy | Firebrand Tukaram Mundhe’s Food Safety Blitz Hits ISKCON Juhu, 3 Licences Suspended | Vande Mataram row erupts in INDIA bloc: Congress objects, ally NC hits back, BJP pounces | Ahmedabad horror: Woman allegedly killed by father, brother to preserve ‘family honour’ over viral photo with male friend | MEA distances itself from Eiffel Tower-BAPS row, says dispute is ‘between entities concerned’ | Eiffel Tower staff strike after female workers 'sidelined' during Hindu group visit
Khari-Sumber Tunnel

Kashmir Rail project: Portion of Khari-Sumber tunnel completed after breakthrough

| @indiablooms | Jan 24, 2022, at 11:37 pm

Banihal/IBNS: A portion of the main tunnel under the Kashmir Rail project in the 110-kms long Banihal Katra railway track has been completed and connected Saturday at a breakthrough ceremony.

The 1,800-metres long railway tunnel between Kundan and Aarpinchala is part of the longest (about 13-kms) railway tunnel of the Indian railway and is under construction in the Khari-Sumber sector of Ramban district.

An official of IRCON International, while talking to Greater Kashmir, said the breakthrough of the main tunnel number T-49B between Kundan Adit and Aarpinchala in Khari tehsil was done successfully on Sunday.

“This part of the tunnel falls in the geological zone of Ramsoo formation which is prone to land-erosion," he said.

This formation has a Rock Mass Rating value between 15-25 and the tunnel is being constructed with the new Austrian tunneling method NATM.

“In this railway tunnel, 344M double track will be laid inside the tunnel as part of Aarpinchala yard,” he added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.