February 17, 2025 07:32 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Lalu Prasad calls Maha Kumbh ‘faaltu,’ sparks controversy amid stampede fallout | Big concerns addressed, I am encouraged: Congress MP Shashi Tharoor lauds Modi's US visit | Prayagraj: 10 Maha Kumbh pilgrims die after car-bus collision on highway | 'US wants a durable peace in Ukraine,' US Vice President JD Vance says after meeting Volodymyr Zelenskyy | 'How can we involve Chief Justice with any executive appointment?' Jagdeep Dhankar's big remark on separation of powers | BJP says AAP renames CMO Delhi X handle to 'KejriwalAtWork', then deletes profile | Mumbai, Assam cops land at Ranveer Allahbadia's residence but could not find him | I will leave it to PM Modi: Donald Trump on Bangladesh crisis | Modi is a much tougher and better negotiator than me: Donald Trump | Modi covered up Gautam Adani's corruption: Rahul Gandhi after PM's 'personal matter' remark in the US
India
Photo Courtesy: Unsplash

India, World Bank sign agreement to construct Green National Highway Corridors Project, says Nitin Gadkari

| @indiablooms | Aug 02, 2024, at 11:31 pm

Union Minister for Road Transport and Highways Nitin Gadkari informed the Lok Sabha on Thursday that the Indian government and the World Bank have signed an agreement for the construction of Green National Highway Corridors Project (GNHCP) in an aggregate length of 781 km.

The highways are planned to be built in Himachal Pradesh, Rajasthan, Uttar Pradesh and Andhra Pradesh.

Gadkari said the highways will be constructed with loan assistance of US $ 500 million against total project cost of US $ 1288.24 million (Rs. 7,662.47 crore).

The scheduled date of completion of last package of GNHCP project is by May 2026.

The project incorporates demonstrating safe and green highway keeping in view climate resilience and use of green technologies by incorporating the following aspects:

Conservation of natural resources using cement treated sub base/reclaimed asphalt pavement;

Promote use of local/ marginal material such as lime, fly ash, waste plastic; and

Use of bio-engineering measures for slope protection like coco fibre/Jute erosion control blanket with shrub/grass plantation, hydroseeding, Shotcrete crib wall with vegetation, Bamboo Plantation, Hedge Brush Layer, interlink chain mesh with grass strips, Geocell with hydroseeding etc. in slope protection works;

Why there is a need for the project?

The use of Green technologies and bio engineering solutions particularly to Hilly area are expected to reduce carbon emissions and ensure conservation of natural resources during the life cycle (construction and operation period) of the project.

The project aims to provide smooth and motorable roads with all-weather connectivity of the nearby areas.

This will result in socio-economic development as well as enhanced trade and connectivity within the region.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.