November 22, 2026 08:20 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Youth Congress workers storm Meta's Hyderabad office, smashes flower pots; gives 7-day ultimatum over account suspension | 'Resign out of shame!': Rajasthan Congress chief demands Bhajan Lal Sharma's exit after BJP's Rajasthan poll rout | Congress sweeps Rajasthan Panchayat polls! BJP suffers major setback as Gehlot, Pilot target ruling party | 'Dropped because his name is Siraj?': Congress alleges discrimination, BJP hits back over pacer's exclusion | Rahul Gandhi's 'compromised PM' jibe at Modi over Trump-Putin-Xi meet leaves BJP fuming | ‘Cyclone Akvan weakens after landfall in Odisha, heavy rain triggers waterlogging in several areas’ | 'No talks until terror stops': Rahul Gandhi's blunt message to Pakistani student in US | 'Khao, peeyo, mauj karo' not Indian culture: PM Modi's big message on savings | Muhammad Yunus's ancestral home set ablaze as Hasina's Awami League flexes street power in Bangladesh | Flower Shower Turns Fatal: 12-Year-Old Dies in Bulldozer Accident at Akhilesh Yadav's Rally
Ahmedabad Metro
A Red Line train of Ahmedabad Metro. Photo: Wikimedia Commons

Ahmedabad Metro gets mega boost: Cabinet approves key airport corridor expansion

| @indiablooms | Jun 10, 2026, at 03:41 pm

The Union Cabinet, chaired by Prime Minister Narendra Modi, has approved Phase 2(A) of the Ahmedabad Metro Rail Project, marking a key expansion of the city’s urban transport infrastructure.

The approved corridor spans 6.032 km and includes five stations—four elevated and one underground—namely Ashram Road, Koteshwar Prachin Mandir, Sabarmati River, Sardar Nagar, and Airport.

With the operationalisation of Phase 2(A), the Ahmedabad–Gandhinagar Metro network will expand to a total of 77.63 km of active metro rail connectivity, significantly strengthening intra-city and inter-city mobility.

The total project cost, including interest during construction (IDC), is estimated at ₹2,169.04 crore.

Strengthening Urban Connectivity

Phase 2(A) is designed to enhance last-mile connectivity and provide seamless metro access to the airport, while linking key residential, commercial, and institutional zones that currently lack efficient public transport options.

The corridor is expected to integrate major urban clusters with the existing Ahmedabad–Gandhinagar Metro network, improving accessibility across high-traffic and high-growth regions. The expansion is also expected to support upcoming infrastructure developments, including proposed sporting facilities in connection with the World Police Games 2029 and the Commonwealth Games 2030.

Reducing Congestion and Emissions

By offering a reliable alternative to road transport, the metro extension is expected to significantly reduce traffic congestion within Ahmedabad. Improved connectivity to the airport and key transit hubs is likely to ease vehicular load, shorten travel times, and enhance road safety.

The expansion is also expected to deliver environmental benefits by reducing dependence on fossil fuel-based transport, thereby lowering overall carbon emissions in the region.

Economic and Social Impact

Improved mobility is expected to enhance productivity by reducing commute times and enabling easier access to workplaces, business districts, railway stations, and bus terminals. The project is also likely to stimulate local economic activity, particularly in areas surrounding the new metro stations, attracting investment and encouraging urban development in previously underserved regions.

From a social perspective, the expanded metro network is expected to improve equitable access to public transportation, benefiting diverse socio-economic groups and enhancing overall quality of life by reducing travel barriers and improving access to essential services.

Employment Generation

The Ahmedabad Metro Phase 2(A) project is expected to generate employment for around 2,000 people during the peak construction phase. Additionally, approximately 500 personnel will be engaged in operations and maintenance once the system becomes operational.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.