June 26, 2025 05:56 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Black box data of crashed Air India aircraft recovered and downloaded: Govt | India refuses to sign SCO joint statement lacking Pahalgam attack but featuring Balochistan unrest | I ended India-Pak conflict with a series of phone calls on trade: Donald Trump reiterates 'ceasefire' claim | Constitution is supreme, all three wings work under it: CJI BR Gavai | Andhra Pradesh murder: Police say wife and her lover killed 26-year-old Tejeswar | 'Vladimir Putin called to help with Iran, I refused': Donald Trump | Engineering issues: British High Commission on F-35 fighter jet stuck in Kerala | Don't ask permission to fly: Shashi Tharoor after Mallikarjun Kharge's snub over article praising PM | Iran executes three men for 'spying' for Israeli spy agency Mossad | Pakistani soldier who captured Abhinandan Varthaman killed by TTP
Indore Metro Rail
Image Credit: texmaco.in

Texmaco wins tender worth Rs 253 cr for Indore Metro’s Yellow Line

| @indiablooms | Oct 27, 2022, at 11:34 pm

Kolkata: Texmaco Rail and Engineering Ltd. has bagged a Rs 252.88 crore contract to supply standard gauge Ballast less Track for the Indore Metro Rail project.

The Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) opened the financial bids for the contract package IN-08 where Texmaco appeared to be the lowest bidder beating the Rs 262.32 crores bid of Larsen & Turbo Ltd. (L&T).

The other bidders were Vijay Nirman Company Pvt. Ltd. and Rail Vikas Nigam Ltd. (RVNL), which could not qualify for the eligibility criteria and tender terms.

As per the tender, the work’s scope includes designing, supplying, installing, testing, and commissioning the Ballast less Track of Standard Gauge for the Indore Metro Yellow Line.

The tender notice for these works was issued in February this year with an approximate value of Rs 238 crores and a period of 1274 days (approximate 3.5 years) for completion.

The value of the project is Rs 252 crores where the root length is 32 km and track length 70 km, which includes complete supply of rails, fasteners, turnout & buffer stops. The line is supposed to be 33.53 km long making a ring line to connect Palasia - Railway Station - Rajwara-Airport - Bhawarsala -
MR10 - Palasia with 30 stations.

Proud to have gotten this opportunity, UV Kamath, Managing Director of Bright Power, EPC Division of Texmaco Rail & Engineering said, “It re-establishes Texmaco’s rich and successful experience in projects related to Metro Rail including laying of ballast less tracks and associated work. It is one more landmark in Texmaco’s achievement in this area.”

(With UNI inputs)

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm
Close menu