October 25, 2026 03:12 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Jamia shifts classes online after clash over demand for student union polls; Congress MPs face allegations | Deadly mid-air collision: Four pilots killed as two military aircraft crash in Philippines | ‘Jihad’ calls, Modi assassination remarks: Mumbai Rapido driver arrested over alleged Jaish links | Vegetarian-only kitchen at Keralam Lok Bhavan? Governor's reported order triggers political backlash | ‘Another little Epic Fury’: Trump’s chilling warning to Iran as fresh US strikes loom | Bomb threat email names Amitabh Bachchan’s Jalsa bungalow, Diljit Dosanjh’s concert venue: Reports | ‘Face-offs still continue’: ITBP chief reveals fresh India-China border tensions in Arunachal | Eiffel Tower women staff row: BAPS monk blames ‘miscommunication’, denies delegation's role | ‘Pen, not stones and guns’: RSS-linked group opens its first office in Kashmir Valley under Muslim leader | First human case of Shamonda virus reported in France; WHO confirms death of immunocompromised patient

L&T wins Rs. 1,885 cr order from NTPC

| | Sep 13, 2014, at 04:21 am
Mumbai, Sept 12 (IBNS): Larsen & Toubro Limited (L&T) through its joint venture company L&T-MHPS Boilers Private Limited (LMB) has secured an order worth Rs. 1,885 crore from NTPC Limited.

The contract includes setting up of two units of 660 MW each supercritical steam generators for Tanda Thermal Power Plant Stage-II on an engineering, procurement and construction (EPC) basis.

LMB’s scope includes design, engineering, supply, construction, erection, testing, commissioning and conducting performance guarantee of two coal-fired steam generator units with supercritical parameters.

The project site is located on the banks of the Tanda canal near Bahadurpur village in the Ambedkar Nagar district of Uttar Pradesh.

This is LMB’s first order for supercritical steam generators from NTPC.

The order was won through competitive bidding involving several national and international players. The project is scheduled to be completed in 46 and 52 months for the respective units.

Commenting on the order, Shailendra Roy, Whole-time Director (Power, Minerals & Metals) L&T said, “We have the manufacturing and execution capabilities to deliver to stringent schedules while conforming to global standards.” The order from NTPC affirms L&T’s credentials in EPC execution of power plant equipment.

LMB is currently executing 11 units of similar large capacity steam generators (660/700 MW) in India totaling 7340 MW.

Two units of Nabha Power Ltd at Rajpura (Punjab) have already achieved commercial operation and the remaining are in advanced stages of execution. LMB also caters to markets in countries like Taiwan, Egypt, Saudi Arabia and the Philippines for engineering services and supply of pressure parts and pulverisers.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.