May 02, 2026 01:25 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bangladesh MP warns of refugee crisis if BJP wins West Bengal polls | Diplomatic row: Bangladesh summons Indian envoy over Himanta Biswa Sarma remarks | Supreme Court grants Pawan Khera anticipatory bail in case over allegations against Himanta Biswa Sarma's wife | ‘Not necessary to humiliate me with arrest’: Pawan Khera to SC over remarks on Himanta Biswa Sarma’s wife | ‘Let’s not choose for people capable of choosing’: Supreme Court to Centre on teen pregnancy termination | I-PAC co-founder Vinesh Chandel gets bail after Bengal polls conclude | Exit Polls Give Bengal to BJP—But One Survey Begs to Differ | Big defence push: Rajnath Singh to hold high-stakes talks with Italy’s Defence Minister | “Voting without fear”: PM Modi hails record turnout in West Bengal polls | Mamata Banerjee trying to intimidate Hindu voters, alleges Suvendu Adhikari in Bhabanipur
L&T
Photo: PR Team

L&T wins order for LIGO India Observatory

| @indiablooms | Feb 24, 2026, at 06:50 pm

Two business verticals of L&T – the Heavy Civil Infrastructure (HCI) and Heavy Engineering (HE) – have jointly won a significant order from the Department of Atomic Energy of Government of India, for establishing the LIGO India Observatory.

The Observatory will come up at Aundha in Maharashtra’s Hingoli district.

LIGO (Laser Interferometer Gravitational Wave Observatory) is used for detection of gravitational waves caused by cataclysmic cosmic events through multikilometer-scale wave detectors using laser interferometry.

The initiative will be one of India’s flagship ‘Mega Science’ projects, developed through a collaboration between premier Indian research institutions — including RRCAT and IPR — and the LIGO Laboratory of the United States, with support from Caltech and MIT.

L&T’s project scope encompasses comprehensive engineering, procurement and construction of vibration sensitive specialised high-precision civil infrastructure, along with the manufacture and installation of ultra-high vacuum compatible 8 KM beam tube and critical equipment for vacuum infrastructure.

Integration of mechanical, electrical, HVAC, fire protection, vacuum control, monitoring system and all support utilities are also in L&T’s scope. The project completion deadline is 48 months.

This prestigious order reinforces L&T’s strong track record and proven expertise in delivering complex projects in the field of science and technology.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm