December 16, 2025 10:39 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Goa nightclub fire horror: Luthra brothers brought back to India from Thailand, arrested | Messi chaos costs minister his job: Aroop Biswas resigns after Salt Lake Stadium fiasco | Bengal SIR draft list out: Around 58 lakh voters’ names dropped | Relief for Sonia, Rahul Gandhi as Delhi court refuses to act on ED chargesheet in National Herald case | Centre moves to replace MGNREGA with 'G Ram G', sets stage for winter session showdown | Messi surrounded by VIPs, fans rage: Five held in stadium vandalism case | 'Messi was uncomfortable, lost his cool!': Ex-India footballer reveals what really happened at chaotic Kolkata stadium | PM Modi embarks on historic three-nation visit to Jordan, Ethiopia, and Oman | Caught in Thailand! Fugitive Goa nightclub owners detained after deadly fire kills 25 | After Putin’s blockbuster Delhi visit, Modi set to host German Chancellor Friedrich Merz in January
Indian Railways
Image Cr: Nitin Waghela

Indian Railways floats tender inviting pvt players to make 80,000 wheels annually

| @indiablooms | Sep 10, 2022, at 05:11 am

The India Railways Friday floated tender inviting bids from private players for setting up a wheel plant with a capacity of manufacturing at least 80,000 wheels annually, according to media reports.

Railway Minister Ashwini Vaishnaw said a blueprint has been drawn to export wheels. He added that this is the first time private entities have been invited to build a unit and manufacture wheels for high-speed trains in India.

According to the plan, while SAIL will provide one lakh of the two lakh wheels needed by the railways every year, the rest will be manufactured by a new "Make in India" plant.

Addressing a press conference, Vaishnaw said the tender will be awarded on the condition that the manufacturing plant will be an exporter of wheels too for the European market.

The other condition of the tender is that the plant has to be set up in 18 months, the minister added.

The wheels of the high-speed Vande Bharat trains were stuck in war-hit Ukraine and those had to be airlifted to meet the timelines set for their production.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm