November 12, 2026 03:56 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Owaisi, Chandrashekhar Azad join hands to challenge BJP in 2027 UP elections | Bihar shocker: Gang-rape survivor thrown off building roof in fresh attack | J&K horror: Two missing SPOs found dead with bullet wounds in Kishtwar | Two missing SPOs found dead with bullet wounds in J&K's Kishtwar | Owaisi, Chandrashekhar Azad join hands to challenge BJP in 2027 UP polls | At least 3 CRPF personnel injured as terrorists open fire on security forces in Jammu and Kashmir's Kulgam | Hijack threat on Air India flight sparks security alert at Kolkata airport before take-off | TMC Canning Paschim MLA Paresh Ram Das arrested at Kolkata airport in rape, extortion cases | Megaspeed breaks silence on Nvidia CEO Jensen Huang row, denies illegal China chip transfers | Nvidia CEO Jensen Huang admits extramarital affair amid shocking Chinese spy allegation
Gurugram Metro
Representational image (Credit: Wikimedia Commons)

Cabinet approves metro connectivity from Gurugram's HUDA City Centre to Cyber City, with spur to Dwarka Expressway

| @indiablooms | Jun 08, 2023, at 05:32 am

New Delhi: The Union Cabinet on Wednesday approved a metro connectivity project from HUDA City Centre to Cyber City with spur to Dwarka Expressway, Gurugram covering a distance of 28.50 km having 27 stations on the route.

The total completion cost of the project will be Rs 5,452 crore.

This will be a standard gauge line of 1435 mm (5 ft 8.5 inches).  The entire project will be elevated.

The spur from Basai village has been provided for connectivity to the depot.

The project is proposed to be completed in four years from the date of sanction of the Project and is to be implemented by Haryana Mass Rapid Transport Corporation Limited (HMRTC) which will be set up as a 50:50 Special Purpose Vehicle (SPV) of the Government of India and Government of Haryana after sanction order is issued.

Commerce and Industry Minister Piyush Goyal said in a press conference that the project cost will be shared by the Centre and the state besides an international development assistance loan.

As of now, there is no metro line in Old Gurugram, but there are plans to establish one that would connect New Gurugram with Old Gurugram.

The 27 stations in this line are: HUDA City Centre – Sector 45 – Cyber Park – Sector 47 – Subhash Chowk – Sector 48 – Sector 72A – Hero Honda Chowk – Udyog Vihar Phase 6 – Sector 10 – Sector 37 – Basai Village – Sector 9 – Sector 7 – Sector 4 – Sector 5 – Ashok Vihar – Sector 3 – Bajghera Road – Palam Vihar Extension – Palam Vihar – Sector 23A – Sector 22 – Udyog Vihar Phase 4 – Udyog Vihar Phase 5 – Cyber City

The spur to Dwarka Expressway (Sector 101)

This proposed metro network is also expected to have a connection with the Indian Railway station. In its subsequent phase, the metro line aims to provide convenient connectivity to the Indira Gandhi International (IGI) airport.
The introduction of this metro line is anticipated to contribute to the overall economic development of the area.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.