April 24, 2026 08:44 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal polls: Mob attacks central forces, 3 CAPF personnel injured in Birbhum | ‘People voting to protect their rights’: Mamata says high turnout backs TMC in Bengal | ‘Fear is being defeated’: PM Modi says high voter turnout signals BJP win in Bengal | Crude bomb attack in Murshidabad’s Nowda as violence hits Bengal polling | ‘Mamata Banerjee’s politics fuelled BJP growth in Bengal’: Rahul Gandhi | 'Will never forget’: Nation remembers Pahalgam victims as leaders vow strong fight against terror | 'India will never bow to any form of terror': PM Modi on Pahalgam terror attack anniversary | TCS Nashik case: No interim bail for Danish Shaikh in religious sentiments case | US woman alleges sexual assault at Karnataka homestay; owner among 2 arrested | ‘PM Modi is a terrorist’: Mallikarjun Kharge sparks row; BJP hits back

BHEL bags Rs.5,600 crore order for Supercritical Power Project in Tamil Nadu

| | Mar 02, 2016, at 01:28 am
Chennai, Mar 1 (IBNS) Reposing confidence in BHEL’s technological and project execution capabilities, Tamil Nadu Chief Minister J. Jayalalithaa handed over the Letter of Award (LoA) for setting up of the Main Plant Package for the 2x800 MW Uppur Supercritical Thermal Power Project (TPP) to Atul Sobti, CMD, BHEL, in Chennai.

This was followed by the foundation stone laying ceremony of the project. Against International Competitive Bidding (ICB), Bharat Heavy Electricals Limited (BHEL) has bagged this major order for setting up the 1,600 MW coal-based thermal power project with supercritical parameters, involving two units of the country’s highest rating 800 MW sets, in Tamil Nadu.

Valued at around Rs.5,600 Crore, the order for the main plant package for the greenfield 2x800 MW Uppur Supercritical Thermal Power Project, located in Ramanathapuram district of Tamil Nadu, has been placed on BHEL by Tamil Nadu Generation and Distribution Corporation (TANGEDCO).

Significantly, this is the second 800 MW rating supercritical order awarded toBHEL from TANGEDCO in less than a month, reinforcing BHEL’s position at the forefront of the power equipment industry in India.

"This prestigious order comes close on the heels of the Main Plant Package contract for the 1x800 MW North Chennai Supercritical TPP Stage III in Tamil Nadu, also placed on BHEL by TANGEDCO, last month. Today, BHEL has a significant share of 83% in TANGEDCO’s cumulative coal-based generating capacity, including two 600 MW sets commissioned in 2013 at North Chennai TPP, comprising in-house designed steam turbines, the first of their kind for both BHEL and the state of Tamil Nadu," BHEL said in a statement.

BHEL's scope of work in the current contract involves design, engineering, manufacture, supply, erection, commissioning & civil works for the Main Plant Package.

The key equipment for the contract will be manufactured at BHEL’s Trichy, Haridwar, Bhopal, Ranipet, Hyderabad, Jhansi, Thirumayam and Bangalore plants while the company's Power Sector - Southern Region shall be responsible for civil works and erection/ commissioning of the equipment.

The project is slated to be commissioned by September, 2019 and the power generated from this 1,600 MW power project will help foster growth in Tamil Nadu and provide easy access to electricity to the people of the state.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm