April 19, 2024 10:56 (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Maldives opposition demands President Muizzu's impeachment over leaked reports alleging corruption by him | AAP claims conspiracy to kill Arvind Kejriwal after mango eating row | India successfully tests Indigenous Technology Subsonic Cruise Missile | Telangana missionary school vandalised after students questioned over saffron attire | Shilpa Shetty's husband Raj Kundra's properties attached by ED in Bitcoin scam
L&T Construction wins contract from Rail Vikas Nigam Limited L&T

L&T Construction wins contract from Rail Vikas Nigam Limited

India Blooms News Service | @indiablooms | 18 Jan 2021, 10:22 am

New Delhi: The construction arm of L&T has secured a Large order for its Heavy Civil Infrastructure business from Rail Vikas Nigam Limited (RVNL) for Package 4 of the New Broad-Gauge Line between Rishikesh and Karanprayag in the State of Uttarakhand, India.

The scope of the project includes construction of Tunnels, Formation, Construction Shaft, and other Ancillary works from Chainage 47+360 to 63+117 Km between Rishikesh and Karanprayag.The project involves the construction of 14.577 Km upline and 13.123 Km downline tunnel with embankments of approximately 800 meters at both ends.

Out of 14.577 Km and 13.123 Km of tunnel, 10.49 Km and 10.317 Km of tunnel will be excavated using two new hard rock Tunnel Boring Machines (TBMs) of diameter 9.1 meters and the balance using New Austrian Tunnel Method (NATM).

The scope also includes construction of an Ellipsoidal cum Ventilation Shaft in the finished cross-section of 79 square meters and depth of 32 meters.

This will be the biggest TBM to be deployed in the Himalayan region in India and the TBM bored tunnel length of 20.807 Km will be the longest for any project in the Himalayan region. The entire project is to be completed within a stringent timeline of 60 months.

“Establishing a rail link between Rishikesh and Karanprayag will not only facilitate easy access to Uttarakhand’s pilgrimage sites, but also enable development of backward areas, connect new trade centres, and serve the resident population. The railway line traverses rugged Himalayan terrains, with the alignment oriented across and sometimes sub parallel to major thrust zones in the Himalayas with complex geological conditions,”said S.V. Desai, Whole Time Director & Senior Executive Vice President (Civil Infrastructure).L&T is already constructing Package 2 of this prestigious project involving 24 Kms of Tunnelling by the NATM, minor bridges and formation works.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.