August 17, 2026 03:08 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe
Guwahati Airport

New terminal building coming up at AAI’s Guwahati airport

| @indiablooms | Oct 07, 2020, at 10:21 pm

Guwahati: Lokpriya Gopinath Bordoloi International Airport, also known as Guwahati International Airport, is the biggest and busiest international airport of North-Eastern India.

To meet the futuristic demands of Guwahati and add to the infrastructural development of the expanding city, Airports Authority of India has undertaken the work for Construction of New Integrated Terminal Building at the cost of Rs 1232 crore.

The LGBI airport currently handles over six million passengers annually. The New Terminal Building will be capable to handle 4300 Domestic and 200International passengers during peak hours and about 10 Million passengers annually.

Equipped with 64 check in counters, 20 self-check in kiosk, six Baggage carousels, In-Line baggage security screening system and 10 Aero Bridges, the terminal will be an energy efficient building.

A top official of AAI said with total built up area of 1,02,500 sq m, the terminal will have two levels, arrival at the lower/apron level and departure at the upper level. In addition to these two primary floors, there will be two more floors; a mezzanine between the two levels, part of which serves as the air-side arrival corridor for passengers alighting from the boarding bridges. The other part of this mezzanine acts as a service floor for the baggage handling system used for outbound baggage.

The design of the terminal building is inspired by Icarus, the mythological figure, one of the earliest inspirations of human flight. The airport roof is styled using the art of Origami, the design is an ode to human endeavor, crafts and innovation.The façade of theterminal will reflect the same language of origami in certain parts owing to the need of solid wall surfaces.

More than 38% of the project work is completed and the new terminal building is scheduled to be ready by June, 2022.

Serving to the one of the fastest growing cities in India, Guwahati Airport also has connectivity with the South East Asia region and is going to attract more passengers in the coming years.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.