August 15, 2026 02:26 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe | From guns to glamour: Former women Maoists walk the ramp in Chhattisgarh | Netaji row: Suvendu Adhikari govt strips BJP MP Anant Maharaj of state honour | Sukhbir Badal attacked by Nihang Sikh with kirpan at Maharashtra gurdwara; assailant detained | ‘If you cannot do it, we will pass an order’: Supreme Court’s final warning to Centre on food labels | ‘Time to move on’: Bombay HC sends strong message in Vijay Mallya-bank dispute
Japan
Photo Courtesy: UNI

Japan to release 54,600 tons of Fukushima nuclear wastewater in 2024

| @indiablooms | Jan 26, 2024, at 11:41 pm

The operator of Japan's crippled Fukushima nuclear power plant, Tokyo Electric Power Company (TEPCO), has announced a plan to release around 54,600 tons of nuclear-contaminated water from the facility into the ocean in fiscal 2024.

The volume is expected to be discharged into the Pacific Ocean in seven rounds, starting from April 1, 2024, to March 31, 2025, according to the plan announced Thursday.

TEPCO is slated to finalize the discharge plan by the March 31 end of fiscal 2023, it said.

Despite concerns and oppositions among local fishermen in Fukushima Prefecture as well as other countries, the Fukushima wastewater discharge started in August 2023. In fiscal 2023, TEPCO is set to release a total of about 31,200 tons of radioactive wastewater in four batches, with the fourth and final round for the year scheduled late next month.

Hit by a 9.0-magnitude earthquake and an ensuing tsunami on March 11, 2011, the Fukushima nuclear plant suffered core meltdowns that released radiation, resulting in a level-7 nuclear accident, the highest on the International Nuclear and Radiological Event Scale.

The plant has been generating a massive amount of water tainted with radioactive substances from cooling down the nuclear fuel in the reactor buildings, which are now being stored in tanks at the nuclear plant.

(With UNI Inputs)

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.