July 22, 2026 03:57 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'We won't leave Jantar Mantar until Dharmendra Pradhan resigns': CJP draws red line | 'Don't waste our time': Supreme Court snubs plea on NEET protest crackdown | Trump's 200% tariff bomb on generic drugs: Here's how India could be hit | Rahul Gandhi, Priyanka Gandhi Vadra lead Congress march to PM Modi's residence over student protest crackdown | 'We can't ignore his concerns': Delhi HC gives Sonam Wangchuk big relief, clears shift to private hospital | 'Students are being tortured': Mamata Banerjee offers to join CJP protest in Delhi | Sikkim tunnel horror: 8 dead, several feared trapped after NHPC project collapse | As NEET protests intensify, PM Modi defends govt action, calls for 'foolproof' education system | After NEET storm, Modi govt faces fresh challenge as farmers march to Delhi over India-US trade deal | Jantar Mantar reclaimed! CJP defies overnight police eviction, returns to protest site

Meghalaya: One body fished out of mine after 42 days

| @indiablooms | Jan 24, 2019, at 04:51 pm

Guwahati, Jan 24 (IBNS): The Indian Navy on Thursday managed to fish out the decomposed body of one of the 15 miners who went missing in an illegal rat-hole mine at Ksan area in Meghalaya’s East Jaintia Hills district 42 days ago.

The rescue team had undergone considerable trouble to being out the body that had been spotted last week. Efforts to pull it out resulted in it disintegrating and slipping to the bottom of the main shaft, said reports. It was finally recovered today.

The highly decomposed body has been sent for post-mortem and search is on for the other missing miners in the flooded mine.

On Monday, the Centre and the state government had assured the Supreme Court they were not abandoning efforts rescue efforts.

Reports said the families of the missing miners want whatever remains of their loved ones possible to be recovered from the flooded mine.

The Odisha Fire Services last Wednesday operated their pump for six and half hours and managed to discharge 5.85 lakh litres water from the main shaft.

On the other hand, the Coal India Limited operated their pumps for 20 hours and discharged 22.68 lakh litres water.

The Coal India Limited surveyors said the water level of the shaft has remained the same.

The Chennai based Planys Technology has also continued their operation for SONAR (Sound Navigation and Raging) mapping of the shaft to sanitize and to identify the rat hole.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.