June 23, 2026 11:48 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Italy and I never beg': Meloni fires back at Trump over G7 photo claim | No more 'brother': Stalin's formal birthday greeting to Rahul reflects deepening rift | TMC seeks disqualification of 20 rebel MPs, Abhishek says 'membership should go' | Nara Lokesh pitches Andhra Pradesh as investment hub during Kolkata visit, sets $2.4 trillion economy goal | 'Least restrictive option': Setback for Telegram as Delhi HC backs Centre's ban ahead of NEET-UG re-test | Fortuner torched, BJP leaders burnt alive: Sand mining feud ends in triple murder in Chhattisgarh | 'If Modi is the leader and India is attacked, we'll be there': Trump's strong assurance at G7 | 'Safety of Indian seafarers of utmost importance': PM Modi's strong message to Trump at G7 | Trump says Iran deal 'not final', threatens fresh strikes if Tehran ‘doesn’t behave’ | G7 declares war on global drug cartels, unveils major anti-trafficking plan
NTPC

NTPC acquires Jhabua Power Limited through Corporate Insolvency Resolution route

| @indiablooms | Sep 06, 2022, at 04:59 am

Mumbai: State-run integrated power generation company NTPC has successfully acquired Jhabua Power Limited (JPL) through Corporate Insolvency Resolution Process initiated by National Company Law Tribunal, Kolkata, (NCLT).

This is the first acquisition of a power asset by NTPC through the NCLT route, a step forward in accomplishing NTPC’s long-term capacity targets.

On Monday (Sept 5), a Shareholders Agreement was signed between NTPC, JPL, and Secured Financial Creditors in New Delhi.

It is a unique Resolution Plan wherein NTPC has offered a 50 percent equity stake in JPL to the secured financial creditors while NTPC has retained all the management rights and control over the company.

Jhabua Power Limited (JPL) is having an operational thermal power capacity of 1 x 600 MW located in Seoni, Madhya Pradesh.

Post-acquisition of JPL, NTPC has become a 70+ GW company with a total installed capacity of 70,064 MW.

With a target set to achieve an installed capacity of 130 GW by 2032 from a diversified portfolio, NTPC has been exploring various opportunities for capacity expansion through both organic and inorganic routes.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm