June 23, 2026 11:51 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
No Hindi, no NEET: Vijay reignites Tamil Nadu's biggest political flashpoints | Messi creates World Cup history with record-breaking double; Mbappe equals Klose's mark hours later | Tech giant Oracle slashes 21,000 jobs while betting big on AI | 'Italy and I never beg': Meloni fires back at Trump over G7 photo claim | No more 'brother': Stalin's formal birthday greeting to Rahul reflects deepening rift | TMC seeks disqualification of 20 rebel MPs, Abhishek says 'membership should go' | Nara Lokesh pitches Andhra Pradesh as investment hub during Kolkata visit, sets $2.4 trillion economy goal | 'Least restrictive option': Setback for Telegram as Delhi HC backs Centre's ban ahead of NEET-UG re-test | Fortuner torched, BJP leaders burnt alive: Sand mining feud ends in triple murder in Chhattisgarh | 'If Modi is the leader and India is attacked, we'll be there': Trump's strong assurance at G7
JSW

JSW Energy starts operations at 225 MW solar project

| @indiablooms | Apr 07, 2022, at 07:52 pm

Mumbai/UNI: Sanjay Jindal led JSW Energy on Thursday said its subsidiary JSW Renewable Energy (Vijayanagar) has commenced operations at the 225 MW solar plant in Karnataka.

This 225 MW solar project is a part of the 958 MW solar and wind projects for which the company has already signed a 25 year power purchase agreement with JSW Steel under the group captive scheme, JSW Energy said in a statement issued here.

"Commencement of operations at the 225 MW of solar plant within the scheduled timelines is a key landmark for the company and testament to its world-class project execution capabilities," Prashant Jain, Joint Managing Director and CEO of JSW Energy, said.

Apart from this, the company is also constructing 2.25 GW of greenfield renewable energy capacity in pursuit of reaching 10 GW capacity by FY25, and 20 GW capacity by FY30, entirely driven by renewables.

"In the coming months, we remain upbeat to commence operations of our under-construction pipeline of 2 GW wind projects, in phases. We will continue to contribute meaningfully in achieving India's renewable capacity and net-zero ambition driven targets," Jain added.

The company has set a target to reach 20 GW capacity by 2030, with the share of renewable energy increasing to 85 percent of total.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm